水利工程案

CCNN Project- HYDRAULIC ENGINEERING


ccnn-01

1. 水利工程案: 承運集集水利工程案的大件貨物內路運送.

Max Seair Logistics Co. award CCNN Hydraulic Turine Project. We transport several huge OOG (Out Of Gauge) and overweight turbine and accessories from Taichung or Kaohsiung port to job site.



ccnn-02
ccnn-03

高雄港-南投竹山路勘報告

Route Survey Report


1.該路線勘查是針對由高雄港至南投竹山水力發電設備陸運而執行之可行性評估報告。
The route survey report is a primary and feasible evaluation for inland transportation from Kaohsiung Port to Nantou Zhushan Hydroelectric Power Plant.

2.該設備本體超寬、超高、超重,利用道路運輸南投竹山水力發電廠工地,運輸途中有高壓電、紅綠燈、路橋 等,且將影響一般道路正常運輸。
The body of the equipment is out of gauge and overweight. It is transported by road to the construction site at Zhushan Hydropower Plant. There are high-voltage electricity facility ,traffic lights, roads, bridges and, etc. during the transportation, affect the safety of transportation to the job site.

3.此在運輸前需確實執行路線勘查,以確保當日道路運輸計畫順利遂行。
Therefore, it is necessary to carry out a route survey at the beginning to ensure the smooth implementation of the road transportation on that day.


ccnn-04

全長約220公里運輸路線共經過高雄市 台南市 嘉義縣 雲林縣 彰化縣 南投縣

The transportation route with a total distance 220 kilometers will pass through Kaohsiung City, Tainan City, Chiayi County, Yunlin County, and Nantou County
規劃路線如下

The route will be planned as followings

高雄34W→擴建路→成功路→四維路→民權路→五福一路→光華路→民族路→台一線→茄定→轉台17線→台南北門→轉61快速道路→嘉義轉78快路道路往古坑方向→轉台3線往竹山方向→竹山砂石車產業道路→抵達目的地(23°48'33.3"N 120°42'20.7"E)